Appearance
Appendices
These appendices collect the supporting theory and practical checklists that the chapters refer to, kept separate so the main narrative stays focused. Each one is short enough to read in a sitting and is written to be consulted again when a study misbehaves.
A. Numerical integration and stability
Every reactive element and every control block in an EMT run is a differential equation turned into a recurrence. Which recurrence is chosen decides how accurate the run is and whether it can blow up. The cleanest way to compare the rules is on the scalar test equation
whose exact solution decays as
| Rule | Update | Order | |
|---|---|---|---|
| Forward Euler | 1 | ||
| Backward Euler | 1 | ||
| Trapezoidal | 2 |
A rule is stable for a given
- Forward Euler is stable only inside a disc: for real
it needs . This is the bound Chapter 17 derives for control blocks, and the reason a time constant shorter than half a step diverges. - Backward Euler and trapezoidal are both A-stable:
for every in the left half-plane, whatever the step. That is why the network can be stepped at a fixed even when it contains time constants far shorter than the step — a stiff circuit.
A-stability is not the whole story. As
Accuracy. The local error per step is
B. The per-unit system
Power engineering normalizes quantities to per unit (pu) so that equipment of very different ratings can be compared and connected through transformers without carrying turns ratios around. Choose two independent bases — a three-phase power
A quantity in pu is its physical value divided by its base. For example, at
Change of base. Equipment data is quoted on the equipment's own rating. To move an impedance from an old base to a new one,
Why transformers disappear. If each side of a transformer takes its rated voltage as
In NumaSim. Most numeric fields have a unit selector, and choosing pu adds a Units tab with the component's S_base (MVA), V_base (kV) and Frequency (Hz) (see Parameters & units). Each component has its own bases, so a machine can be entered on its own rating and a line on the system base, side by side. Synchronous machines, induction machines and transformers take their impedance data in pu on their own S rated and rated voltage, exactly as datasheets quote it.
Common pitfalls.
- Single-phase versus three-phase bases. Using
with gives the same , so either is consistent — mixing one of each is not. - Percent versus per unit. Nameplates often quote impedance in percent: 10 % is 0.1 pu.
- Peak versus RMS. Bases are RMS. An EMT waveform's peak phase voltage at 1 pu is
, not . - A forgotten base change. A generator's 0.2 pu reactance on 50 MVA is 0.4 pu on a 100 MVA system base. Using the number unconverted halves the fault current contribution you expect.
C. Choosing the time step
A practical procedure, in the order the constraints usually bind:
- List the fastest phenomena you must resolve. A switching frequency
, a ringing frequency , the travel time of the shortest travelling-wave line, the fastest control time constant. - Resolve the fastest period. Aim for at least 20 and preferably 50–200 steps per period of the fastest oscillation you care about. For switching, Chapter 6 uses the count
; is comfortable, and a few tens is the floor before the waveform visibly degrades. - Respect the line ceiling. A travelling-wave line needs
; with a longer step NumaSim represents the line as a nominal instead (Chapter 9). The delay is rounded to steps, a relative error of up to , so tens of steps per transit keeps the travel time honest. - Respect the control bound. Every control time constant
must satisfy (Appendix A). A constant much shorter than the step usually means nothing at that resolution; set it to zero rather than shrinking the step to accommodate it. - Check convergence. Halve
and re-run. With the trapezoidal network the error should drop by about four; if the waveform you care about does not move, the larger step was adequate. - Budget run time. The number of steps is duration
. When one part of the circuit needs a much finer step than the rest, run that part in a subsystem at a multiple of the outer rate instead of slowing the whole network.
Symptoms of a step that is too large: ringing at the wrong frequency or amplitude, switching events that land late, a travelling-wave line silently modelled as a
D. Verifying an EMT model
A checklist for trusting a result before you act on it:
- Hand-check the steady state. Before looking at the transient, compare the settled values against something you can compute: Ohm's law, a voltage divider,
or , a second-order and , a load-flow solution. Module 1 works this way throughout. - Check the start. A run should begin either from rest by design or in equilibrium. An unexplained surge in the first cycles usually means a source stepped on at
, a machine without a load flow, or a controller without a matching operating point (Chapters 15 and 18). Ramp the sources or initialize from a load flow. - Check that nothing floats. Every electrical island needs a path to ground; the log warns about floating subnetworks.
- Check the energy balance. Power in should equal power out plus losses plus the rate of change of stored energy. A source delivering power into a purely reactive network over a full cycle is a modelling error.
- Refine the step. Halve
and confirm the answer converges (Appendix C). - Compare against an independent method. A phasor calculation for the steady state, a closed-form transient for a simple subcircuit, or a published benchmark for a standard system such as the IEEE 9-bus or two-area cases.
- Read the log. Warnings about algebraic loops, fractional line delays and parameter ranges are the simulator telling you where its assumptions were stretched.
- Change one thing at a time. When a result surprises you, vary a single parameter and predict the direction of the change before you run. A model you can predict is a model you understand.
References
- H. W. Dommel, Electromagnetic Transients Program (EMTP) Theory Book, Bonneville Power Administration — appendices on ordinary differential equation solution, re-initialization at discontinuities, and per-unit quantities.
- J. Arrillaga and N. R. Watson, Power Systems Electromagnetic Transients Simulation, IET Power and Energy Series 39 — numerical integration and the analysis of continuous and discrete systems.
- J. C. Butcher, Numerical Methods for Ordinary Differential Equations, Wiley — stability regions and A-stability.
- J. D. Glover, T. J. Overbye and M. S. Sarma, Power System Analysis and Design, Cengage — the per-unit system and change of base.
Previous: Module 6 — System studies · Back to the course syllabus.